Location: Shores of Sydney Harbour

Contractor: Andersal Engineering Pty Ltd

Date: 1991-92

Surface Material: Engineering concrete

Product: DRY-TREAT 100N™

The Sydney Opera House was completed in 1973 and has a required service life of over 200 years. It is located on the shores of Sydney Harbour, adjacent to the city's business district. The elements of the building are subject to both an aggressive urban and marine environment.

Download the full case study